The cross over from 16 to 17 near the pump house has collapsed. These metal culverts were installed when the course was built in the 70's. The bottoms of these pipes have rotted away. We installed a plastic pipe and rebuilt the head walls with rock.
Sunday, February 21, 2016
Saturday, February 20, 2016
Tree work continues
This past week we have limbed up the pines on #5. It takes a lot of time to remove and cleanup the debris from all the limbing. The approach to this hole receives very little sunlight and by raising the canopy of these trees, I hope that we can dry this area up. As you can see from the photos, a lot of limbs were taking out.
Tuesday, February 2, 2016
Winter storm Jonas
Last weeks snowfall of 15" was very heavy and wet. I had to rent a bulldozer( a first for me) to help scrape driveways and neighborhoods, as well as the city streets. All of my equipment was getting stuck due to the snow being so heavy. Enjoy the pics.
Subscribe to:
Posts (Atom)