The cross over from 16 to 17 near the pump house has collapsed. These metal culverts were installed when the course was built in the 70's. The bottoms of these pipes have rotted away. We installed a plastic pipe and rebuilt the head walls with rock.
Sunday, February 21, 2016
Saturday, February 20, 2016
Tree work continues
This past week we have limbed up the pines on #5. It takes a lot of time to remove and cleanup the debris from all the limbing. The approach to this hole receives very little sunlight and by raising the canopy of these trees, I hope that we can dry this area up. As you can see from the photos, a lot of limbs were taking out.
Tuesday, February 2, 2016
Winter storm Jonas
Last weeks snowfall of 15" was very heavy and wet. I had to rent a bulldozer( a first for me) to help scrape driveways and neighborhoods, as well as the city streets. All of my equipment was getting stuck due to the snow being so heavy. Enjoy the pics.
Tuesday, January 5, 2016
Winter has finally arrived
This morning it was a cool 10* at the shop. It only got to the mid 30's for a high. This week we have been chipping all of our limbs from the pine trees as well as fixing the damage by the 10th tee from last weeks rain event.
Monday, January 4, 2016
2015 rainfall totals
We managed to hit 100" of rain for the year of 2015! Let me break that number down just a bit more. The lowest month on rain was march coming in at 3.3". The most rain for a month was December at 19.7". We had 45" from January - August . We had 55" from September to December. That's over 8' of rain. El NiƱo is providing us with a wet winter, if we could only get some snow!
Monday, December 28, 2015
Wedding in the dominican
After 4 years of dating we finally said our "I do's". I want to thank the club members for giving us such an amazing engagement party back in the summer. We spent 10 days in punta Cana for the wedding/ honeymoon. A total of 27 family and friends attended our wedding. Here are a few pics from our trip.
Tree work
IWith all the rain, and the fairways too wet to aerate, tree work has started around the course. We are currently working on holes 6-8 right now. We are raising the canopy of all the trees that are along the cart paths, and even removing a few pines to let sun in on a few holes. It's been a tough winter trying to accomplish all of our winter work due to the excessive amount of rain.
Subscribe to:
Posts (Atom)





























